摘要 针对某公司水煤浆气化关键设备运行10年来在生产过程中出现的问题,从原始设计和设备结构以及工艺条件等方面进行了详细分析,并采取了相应的措施进行设备改造,取得了节能降耗、降本增效,达到了水煤浆气化高负荷、长周期运行的目的。 In view of the problems in the operation of GE cws gasification key equipment in our plant in the past 10 years,this paper makes a detailed analysis from the aspects of original design,equipment structure and process conditions,and adopts the corresponding measures to carry out the equipment transformation,energy-saving,cost-reducing and efficiency-increasing have been achieved,and the aim of high load and long period operation of cws gasification has been achieved.
作者 张临乐 Zhang Linle(Shenhua Baotou Coal Chemical Co.,Ltd.,Baotou 014000,China)
出处 《山东化工》 CAS 2022年第4期157-159,共3页 Shandong Chemical Industry
关键词 设备 水煤浆 运行故障 技术改造 equipment coal water slurry operation failure technical transformation
  • 相关文献

参考文献1

二级参考文献4

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部