期刊文献+

基于全寿命周期成本理论的租赁标准厂房与购地建厂的方案比选方法 被引量:1

Comparison and Selection Method between Leasing Standard Plant and Purchasing Land for Plant Construction Based on Life Cycle Cost Theory
下载PDF
导出
摘要 在项目决策阶段,中小企业决策者在选择租赁标准厂房建厂的方案还是购地建厂的方案时常存在分歧,文章运用全寿命周期成本(LCC)理论,构建了包括初始投资成本、运行成本、退役成本、资金占用成本的全寿命周期成本(LCC)计算模型。通过案例分析得出:运用LCC理论进行租赁标准厂房建厂方案与购地建厂方案比选是可行的,当项目寿命周期n≤10年时,租赁标准厂房的全寿命周期成本(LCC)较低,寿命周期n≥10年时,购地建厂的全寿命周期成本(LCC)较低。因此,中小企业可根据自身的发展规划的需要进行选择,达到项目利润最大化的目的。 In the project decision-making stage, the decision-makers of small and medium-sized enterprises often have differences in choosing the scheme of leasing standard plant or purchasing land for plant construction. This paper uses the life cycle cost(LCC) theory to build a life cycle cost(LCC) calculation model including initial investment cost, operation cost, decommissioning cost and capital occupation cost. Through case analysis, it is concluded that it is feasible to use LCC theory to compare the construction scheme of leased standard plant with that of land purchase. When the project life cycle n≤10 years, the life cycle cost(LCC) of leased standard plant is lower,and when the life cycle n≥10 years, the life cycle cost(LCC) of land purchase is lower. Therefore, small and medium-sized enterprises can choose according to their own development planning needs to achieve the purpose of maximizing project profits.
出处 《大众科技》 2022年第2期171-174,159,共5页 Popular Science & Technology
关键词 全寿命周期成本 租赁标准厂房 购地建厂 比选方法 机会成本 life cycle cost lease standard plant land purchase and plant construction comparison and selection method opportunity cost
  • 相关文献

参考文献1

二级参考文献31

  • 1许玲.南京地铁冷水机组选择与全寿命周期费用分析[J].暖通空调,2004,34(11):81-82. 被引量:7
  • 2梁庆卫,宋保维,潘光,李正.鱼雷寿命周期费用研究技术[J].火力与指挥控制,2005,30(3):14-17. 被引量:5
  • 3王恩茂,刘晓君,刘振奎.节能住宅全寿命周期费用研究[J].建筑经济,2006,27(6):89-92. 被引量:18
  • 4李兆坚,江亿,周凤广.我国城镇住宅节能空调器寿命周期费用评价研究[J].建筑经济,2007,28(4):31-35. 被引量:4
  • 5GUPTA Y,CHOW,W.S. Twenty-five years of life cycle costing - theory and applications: a survey [J]. Quality and Reliability.,1985. 2: 51- 76.
  • 6[日]日比宗平.寿命周期费用评价法-方法及实例[M],高克勒等译北京:机械工业出版社,1988:2-16.
  • 7S.J.KIRK. Life Cycle Costing:problem solver for engi- neers [J].Architectural Record., 1979,41 (6) : 3-9.
  • 8GANSLER,J.S. Application of life cycle costing to the DoD system acquisition decision process [C]. Proceedings of Annual Reliability and Maintainability Symposium,Los Angeles,.Institute of Electrical and Electronics Engi- neers, New York., 1974 (7) : 147 - 148.
  • 9R. Curran. A. K. Kundu. J. M. Wright. S. Crosby.M. Price. S. Raghunathan. E. Benard.Modeling of aircraft manufacturing cost at the concept stage [J].Adv Manuf Technol 2006(31): 407- 420.
  • 10Cheung WM,Newnes LB,Mileham AR,Marsh R,Lanham JD.Design to life cycle by value-oriented life cycle costing [C].Proceedings of the ASME International Design Engineering Technology Conference and Computers and Information in Engineering.2008,(4): 721-730.

共引文献17

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部