乐红特长隧道通风系统设计及运营优化研究 被引量:4

Study on Ventilation System Design and Operation Optimization of Lehong Extra-long Tunnel
下载PDF
导出
摘要 依托乐红特长隧道工程,介绍了工程概况、需风量计算、通风方案论证。基于全寿命周期成本分析,推荐采用分段纵向式通风方式:右线采用单斜井两区段通风,左线采用两斜井三区段通风,左、右线均为三区段排烟,同时,根据近、远期交通量不同,制定了相应的通风系统运营策略,最大限度地提升了通风井通风效率,并降低了隧道运营费用。 In relation to the Lehong extra-long tunnel project, the project profile, the calculation of the required air volume and the demonstration of the ventilation scheme are introduced. Based on the life-cycle cost analysis, it is recommended to adopt sectional longitudinal ventilation: the right line adopts two sections of single inclined well for ventilation, the left line adopts three sections of two inclined wells for ventilation, and both the left and right lines adopt three sections for smoke exhaust. At the same time, according to the near-and long-term traffic volume, the corresponding ventilation system operation strategy is formulated to maximize the ventilation efficiency of the ventilation shaft and reduce the operating cost of the tunnel.
作者 蔡厚强 王建 任光远 袁枫斌 CAI Houqiang;WANG Jian;REN Guangyuan;YUAN Fengbin(CCCC Second Highway Consultants Co.,Ltd.,Wuhan 430056,China;China Highway Engineering Consulting Corporation,Beijing 100195,China)
出处 《路基工程》 2022年第2期179-182,共4页 Subgrade Engineering
关键词 乐红特长隧道 分段送排式通风 通风运营 通风计算 全寿命周期 集中排烟 Lehong extra-long tunnel sectional exhaust ventilation ventilation operation ventilation calculation life cycle central exhaust
  • 相关文献

参考文献8

二级参考文献48

共引文献40

同被引文献26

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部