海翔路高架桥钢箱梁顶推施工关键技术分析 被引量:3

Analysis on Key Technology of Steel Box Girder Jacking Construction of Viaduct of Haixiang Road
下载PDF
导出
摘要 钢箱梁顶推施工是高架桥工程中的一项关键步骤,结合葫芦岛市海翔路高架桥钢箱梁工程实践,对钢箱梁顶推施工设计方案及重要步骤进行了详细介绍,并采用ANSYS有限元程序对顶升过程中垫块进行了仿真分析,总结了各施工过程中的要点与难点,对促进交通事业发展有重要意义。 The pusher,site construction is a key step in viaduct project,combined with the huludao city hai cheung road viaduct project,steel box girder engineering practice,the pusher for steel box girder construction principle and important step in detail,and in the process of using ANSYS finite element program the jack-up block has carried on the simulation analysis,summarizes the key points and difficulties in the construction process,It is of great significance to promote the development of transportation.
作者 唐宁 TANG Ning(Dalian Branch of China Railway Ninth Bureau Group,Dalian 116000,China)
出处 《价值工程》 2022年第13期122-124,共3页 Value Engineering
关键词 高架桥 钢箱梁 顶推施工 viaduct steel box girder push construction
  • 相关文献

参考文献7

二级参考文献21

共引文献39

同被引文献10

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部