期刊文献+

上跨既有地铁隧道的明挖基坑施工关键技术

Key Technology of Open Excavated Foundation Pit Construction for Overcrossing Existing Metro Tunnel
下载PDF
导出
摘要 上海徐家汇中心虹桥路地块4-15区基坑施工大部分在运营的地铁隧道上方进行,由于其地理位置特殊,底板下有轨道交通9号线穿过,所以施工难度较大。通过采取一系列施工技术,解决了基坑开挖卸载后可能造成地铁隧道上浮所引起的变形问题,顺利完成了4-15区的基坑开挖施工。 Most of the foundation pit construction in zone 4-15 of Hongqiao Road plot in Xujiahui center,Shanghai is carried out above the operating subway tunnel.Due to its special geographical location,rail transit line 9 passes under the floor,so the construction is difficult.By adopting a series of construction technologies,the deformation problem caused by the floating of metro tunnel after foundation pit excavation and unloading is solved,and the foundation pit excavation construction in zone 4-15 is successfully completed.
作者 王志刚 WANG Zhigang(Shanghai Construction Group Co.,Ltd.,Shanghai 200080,China)
出处 《建筑施工》 2022年第3期452-453,463,共3页 Building Construction
关键词 上跨既有地铁区间 基坑开挖 地铁隧道 变形控制 overcrossing existing subway section foundation pit excavation metro tunnel deformation control
  • 相关文献

二级参考文献8

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部