摘要
针对大采高工作面回采初期坚硬顶板控制难题,以玉溪煤矿1301大采高工作面为工程背景,提出在工作面回采初期采用深孔预裂爆破技术对顶板岩层进行弱化,弱化了顶板岩层,缩短了来压步距,降低了来压强度。
In view of the difficult problem of hard roof control in the initial stage of large mining height face,taking the 1301 large mining height working face of Yuxi Coal Mine as the engineering background,it is proposed that the roof strata should be weakened by deep hole presplitting blasting technology in the early stage of working face.Weakening the roof strata,shortening the pressure step distance,and reducing the pressure strength.
作者
朱瑞岩
Zhu Ruiyan(Shanxi Xingxin Safety Production Technical Service Co.,Ltd.,Shanxi Taiyuan 030024)
出处
《山东煤炭科技》
2022年第3期13-15,共3页
Shandong Coal Science and Technology
关键词
大采高
顶板
爆破
预裂
large mining height
roof
blast
presplitting