摘要
彬长矿区孟村煤矿401101综放工作面过DF29正断层时,采用注浆加固施工技术,加固工作面断层附近破碎区域的松软煤岩体,提高煤壁的强度和稳定性,保证割煤过程中顶板完好,煤帮无片帮垮落和冒顶。
When the 401101 fully mechanized top coal caving working face of Mengcun Coal Mine in Binchang mining area passes through the DF29 normal fault,the grouting reinforcement construction technology is adopted to strengthen the soft coal rock mass in the broken area near the fault,improve the strength and stability of the coal wall,ensure that the roof is intact in the process of coal cutting,and there is no sheet collapse and roof fall of the coal gang.
作者
曹天章
韩帅
Cao Tianzhang;Han Shuai(Weinan Shaanmei Qichen Technology Co.,Ltd.,Shaanxi Weinan 714000)
出处
《山东煤炭科技》
2022年第3期73-74,共2页
Shandong Coal Science and Technology
关键词
综采
注浆
断层
fully mechanized mining
grouting
fault