某商业综合体项目燃气冷热电三联供系统发电设备容量的确定方法 被引量:2

One Method to Determine the Capacity of Power Generation Equipment for CCHP for a Commercial Complex Project
下载PDF
导出
摘要 该文介绍了在三联供系统发电只能并网不能上网的地区,燃气冷热电三联供系统发电设备容量选择的一种方法。根据商业综合体项目负荷特性,通过全年逐时负荷计算及分析,首次通过解析不同负荷率下的小时数方程,按能源利用效率最高、全年高效率累计负荷最大的原则,确定发电设备的最优容量,并通过投资回报分析,验证此方法的可行性。 This paper introduced one method to determine the power generation equipment for CCHP in the area where the power generation of CCHP can only be grid-connected but not output to the external grid. According to the load characteristics of a commercial complex, and based on the analysis of the hourly load of a commercial complex project throughout the year, the optimal volume of the power generation equipment was determined by analyzing the equation of hours under different load rates and taking the principles of the highest energy utilization efficiency and the highest efficient cumulative load. On this basis, the feasibility of this method was verified with the return on investment analysis.
作者 张瑜 Zhang Yu
出处 《重庆建筑》 2022年第4期60-62,64,共4页 Chongqing Architecture
关键词 燃气冷热电三联供 发电设备容量 全年逐时负荷计算 高效率累计负荷 combined cooling heating and power(CCHP) power generation capacity hourly load calculation throughout the year the high efficient cumulative load
  • 相关文献

参考文献7

二级参考文献46

共引文献55

同被引文献21

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部