摘要
对海绵城市项目建设过程中的审批管理要点进行了探索研究,对比了海绵项目管控与传统项目管控的差异。并结合国家简政放权和工程审批制度改革的工作要求,以及海绵城市项目技术审查难度大的特点,提出了以诚信备案为主,加强事中事后监管的管控方式。以此为基础探讨了规划、建设、验收等阶段的行政审批的方法、主要内容以及技术要求。该方式已经应用于部分城市,实践证明具有良好的管理成效,且操作简单。
The key points of the approval and control management during the construction of the sponge city projects were explored. The difference in the management between sponge city project and traditional project was compared. Combined with the requirements of simplifying administration and delegating power, the reform of project approval system, and the difficulty of technical review of sponge city project, the management and control method of record keeping based on credit and compliance oversight is proposed. In addition, the methods, main contents and technical requirements of administrative approval in the stages of planning, construction, and acceptance are discussed. This method has been applied to some cities and proved to be simple and effective in management.
作者
栗玉鸿
李帅杰
宗晶
LI Yu-hong;LI Shuai-jie;ZONG Jing(CAUPD Planning&Design Consultants Ltd.,Beijing 100037,China;China Academy of Urban Planning&Design,Beijing 100037,China)
出处
《中国给水排水》
CAS
CSCD
北大核心
2022年第6期55-58,59,共5页
China Water & Wastewater
关键词
“放管服”改革
海绵城市
建设管控制度
reform of government functions
sponge city
construction control system