摘要
某国际神经研究所China-ini工程施工中,针对特殊医用功能区域模块化深化设计与安装的施工难点,通过提前策划、过程预控、过程检查、问题分析、成果研究等管理手段,随时调整工序的穿插、工艺的细节、过程的质量控制等精细化管理,实现了建筑施工与医疗设备安装的无缝对接,解决了医院建筑工程中的医疗设备区域的工程质量问题,保证了工程总体的进度要求和质量标准、社会经济效益良好。
In the construction process of China-ini project of an International Neurological Institute,aiming at the construction difficulties of modular deepening design and installation of special medical functional area, through management means such as planning in advance, process pre-control, process inspection, problem analysis and result research and fine management such as adjusting interweaving of process, process details and process quality control at any time, the seamless connection between building construction and medical equipment installation is realized, and the engineering quality problem of medical equipment area in hospital construction project is solved, and ensures the overall progress of the project requirements and quality standards, good social and economic benefits.
作者
刘丙宇
孙文志
高英
刘皓
张凤玲
张赛飞
LIU Bing-yu;SUN Wen-zhi;GAO Ying;LIU Hao;ZHANG Feng-ling;ZHANG Sai-fei(BCEG Road and Bridge Construction Group Co.,Ltd.,100123,Beijing,China)
出处
《建筑技术》
2022年第4期476-479,共4页
Architecture Technology
关键词
特殊
医用功能区域
模块化
深化设计
安装
special
medical functional area
modula
deepening design
installation