介绍了贺州市城市供水的备用水源路花水库工程的基本情况,在充分保障工程城市供水的首要任务前提下,本着合理利用水资源、充分发掘利用工程的原则,结合供水线路布置情况,选取适当位置布置引水式发电厂房,利用供水富余水头发电,使工程达到了综合利用的目的,提高了工程综合效益。
An introduction was made on the general information of Luhua Reservoir Project, the backup water source of Hezhou City. Under the premise of fully ensuring the primary task of urban water supply, following the principle of rationally utilizing water resources and making full use of the project, combined with the layout of water supply pipeline, diversion type powerhouse was arranged at proper position for power generation by utilizing surplus head of water supply, so as to achieve the purpose of comprehensive utilization and improve the comprehensive benefits of the project.
作者
张纪智
ZHANG Ji-zhi(Guangxi Water and Power Design Institute Co.,Ltd.,Nanning 530023,China)
出处
《广西水利水电》
2022年第2期58-61,69,共5页
Guangxi Water Resources & Hydropower Engineering
关键词
隧洞引水
明压力管道
引水式厂房
发电
城市供水
Tunnel diversion
open pressure pipe
diversion type powerhouse
power generation
urban water supply