摘要
结合鱼梁航运枢纽库区浸没点与内涝点处理工作实践,总结了库区浸没点与内涝点处理的主要经验和做法。工程于2020年通过竣工移民安置验收。
Combined with the practice of treatment for the submerged sites and waterlogging sites in the reservoir area of Yuliang Navigation Complex, a summarization was made on main experience and measures. The resettlement work of this project passed the completion examination in 2020.
作者
梁振城
韦朝勇
LIANG Zhen-cheng;WEI Chao-yong(Guangxi Xijiang Development&Investment Group Co.,Ltd.,Nanning 530022,China)
出处
《广西水利水电》
2022年第2期109-111,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
浸没点
内涝点工程措施
安置补助
鱼梁航运枢纽
Submerged site
engineering measures for waterlogging site
resettlement compensation
Yuliang Navigation Complex