4BADR S A, SCHISSLER A, SALAMON, et al. Numerical modeling of yielding chain pillars in longwall mines[C]//Proc of the 5th North American Rock Mechanics Symposium, Toronto, 2002.. 99-107.
5YAVUZ H. An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines [J]. International Journal of Rock Mechanics & Mining Sciences, 2004,41 (2): 193-205.