期刊文献+

富水软土地层盾构近距离始发下穿既有线路风险及应对措施研究 被引量:1

Risk and countermeasure research on watery soft soil strata tunnel under-passing existing tunnel lines with departure stations at close distance
下载PDF
导出
摘要 新建城市轨道交通盾构隧道下穿既有运营线路隧道时,将对既有隧道地层产生扰动,若施工处理不当,会对既有线路隧道造成严重后果。文章以苏州市轨道交通5号线劳动路站—新市桥站新建隧道下穿2号线劳动路站—胥江路站运营隧道为背景,探讨盾构近距离始发并下穿既有运营线路隧道主要风险及相关应对措施,以期为富水软土地层同类工程安全施工提供技术参考和经验借鉴。 A new shield tunnel will disturb the stratum of the existing tunnel,when under-passing an existing running tunnel.If the construction is not handled properly,it may cause serious consequences to the existing tunnel.Based on the background of the newly built tunnel from Laodong Road station to Xinshiqiao station of Suzhou metro line 5,which is under-passing line 2 on Laodong Road station to Xujiang Road station,this paper discusses the main risks and relevant countermeasures of close distance departure and under-passing existing tunnel of running line,in order to provide technical references and experiences for the safe construction of similar projects in watery soft soil strata.
作者 张海 Zhang Hai
出处 《现代城市轨道交通》 2022年第S01期69-73,共5页 Modern Urban Transit
关键词 城市轨道交通 盾构 富水地层 近距离始发 下穿既有线 控制措施 urban rail transit shield watery strata close distance departure under-passing existing line control measure
  • 相关文献

参考文献14

二级参考文献102

共引文献50

同被引文献15

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部