摘要
苏州市轨道交通近年来发展迅速,目前所有已开通线路的车站装修都采用较为传统的装修方式。根据苏州市轨道交通5号线“裸装”试点车站的实施情况,并统筹考虑地下车站站后施工的不同阶段,寻找传统车站装修的共性问题,对这些问题进行深层分析。采用案例分析法和比较分析法,针对提升苏州市轨道交通土建及机电施工质量、加强设计统筹规划及提升项目管理水平方面进行探讨。目的是提升苏州市轨道交通机电装修一体化施工水平,推进“裸装”车站的方式,实现地下车站站后施工管理全过程的提升。
The Suzhou rail transit has developed rapidly in recent years.At present,the more conventional finishing methods are adopted in finishing of all the stations on opened lines.As per the implementation of"naked finishing"pilot stations on Suzhou rail transit line 5,in consideration of the different stages of underground stations construction,the common issues in traditional station finishing are found,and depth analysis is made to these projects.Through the case analysis method and the comparative analysis method,the aspects of improvement of the civil engineering and electromechanical construction quality of the Suzhou rail transit,enhancement of the overall design planning and improvement of the project management level are discussed.The purpose is to improve the electromechanical finishing integration construction level of the Suzhou rail transit,promote the method of"naked finishing"of the stations,and improve the whole process of construction management of underground stations.
出处
《现代城市轨道交通》
2022年第S01期154-156,共3页
Modern Urban Transit
关键词
城市轨道交通
装修
裸装
一体化
urban rail transit
finishing
naked finishing
integration