摘要
当前,随着科技水平的不断提高,许多先进的科学技术也逐渐运用于农村各种基础设施与种植技术上,使农村向着现代化、高技术水平发展。但是,一些农村地区水资源紧缺一直是影响农民群众正常生活、阻碍农村经济发展的重要因素。水资源紧缺的重要因素之一就是在农田水利工程建设过程中,土方填筑碾压施工质量没有达到标准要求。基于此,针对农田水利工程土方填筑碾压施工质量展开了探讨。
The main source of rural economic development and farmers’living income is planting crops.Similarly,the yield of farmland crops directly affects farmers’income and rural economic development.At present,with the continuous development of scientific and technological level,many advanced science and technology have been gradually applied to various rural infrastructure and planting technology,so as to make the rural areas develop towards modernization.However,in some rural areas,the difficulty of water resources has always been an important factor affecting the normal life of farmers and hindering the development of rural economy.The main water resource problem comes from that the construction quality of earthwork filling and rolling does not meet the standard requirements in the process of farmland and water conservancy project construction.
作者
胡开北
HU Kai-bei(Wuwei Quanyuan Water Pipe Office,Minqin County,Wuwei City,Gansu Province,Minqin,Gansu 733300)
出处
《农业灾害研究》
2021年第12期188-189,共2页
Journal of Agricultural Catastrophology
关键词
农田
水利工程
土方填筑碾压
施工质量
控制措施
Farmland
Hydraulic engineering
Earthwork filling and rolling
Construction quality
Control measures