新疆乌鲁木齐河分洪工程拦河引水枢纽布置及特点

Layout and Characteristics of Water Diversion Hub for Urumqi River Flood Diversion Project in Xinjiang
下载PDF
导出
摘要 针对挡水水头较低、泄洪流量较大、深厚砂卵砾石基础、河水中泥沙含量较大等特点,结合工程实际情况,提出了2种闸址布置形式;通过技术、经济综合分析比选,确定采用从右岸到左岸分别布置引洪闸、冲沙闸、泄洪闸及土工膜斜墙砂砾石坝的布置方式。目前根据此布置方案已完成分洪渠首单位工程验收。该布置方案可为同类型工程布置比选提供借鉴。 According to the characteristics of low water head, large flood discharge, deep sand gravel foundation, and large sediment content in river water, two types of sluice layout are proposed in combination with the actual situation of the project. Through technical and economic comprehensive analysis and comparison,the layout of flood diversion sluice, scouring sluice, flood discharge sluice and geomembrane inclined wall gravel dam from right bank to left bank is determined. At present, according to this layout scheme, the project acceptance of the flood diversion headwork unit has been completed, which can provide reference for the comparison and selection of similar projects.
作者 白阳 BAI Yang(Xinjiang Water Conservancy and Hydropower Survey and Design Institute Co.,Ltd.,Urumqi 830000,China)
出处 《红水河》 2022年第2期50-54,共5页 Hongshui River
关键词 拦河闸 引水枢纽 乌鲁木齐河分洪工程 枢纽布置 分洪渠首 sluice water diversion project Urumqi River Flood Diversion Project layout of hydroproject flood diversion headwork
  • 相关文献

参考文献6

二级参考文献30

  • 1徐国宾.低坝枢纽中泄洪冲沙闸宽度的计算[J].泥沙研究,1993,19(4):65-71. 被引量:2
  • 2朱睿.浅析泾河灌区体制优化改革[J].甘肃水利水电技术,2005,41(2):113-114. 被引量:1
  • 3唐日长.低水头枢纽凸岸工程的引水防沙研究[J].泥沙研究,1983,(3).
  • 4谢致刚 欧阳昭鑫.新疆的曲线沉沙地[J].泥沙研究,1983,(3).
  • 5宋祖诏.渠首工程(第2版)[M].北京:水利电力出版社,1989..
  • 6陈文彪.引水建筑物取水口位置及高程的确定方法[J].水利水电技术,1985,(12).
  • 7-.国外低水头引水防沙枢纽专集①[J].新疆水利科技,1982,(1).
  • 8张江甫.引渠式进水枢纽的设计原理及运行方式.全国低水头枢纽工程泥沙问题学术讨论会交流论文[M].,1982..
  • 9赵中潜 邹开化.努尔河与桑株河分层式引水枢纽技术总结[J].新疆水利科技,1982,(4).
  • 10郭士付.新疆底栏栅引水渠首[J].泥沙研究,1983,(2).

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部