EPC总承包模式下的项目进度偏差分析研究 被引量:2

An Analytical Study of Project Schedule Deviations under EPC Contracting Mode
下载PDF
导出
摘要 项目进度管理是项目管理的一项重要工作,进度偏差是项目管理中最常见的的一种现象。进度偏差往往造成工程成本增加、工程质量下降和项目工期延长,最终给投资者造成经济损失。预防进度偏差需要分析造成进度偏差的根本原因。通过分析多个EPC案例统计的数据,对造成进度偏差的共性因素进行深入分析,并给出纠正偏差的应对措施。 Project schedule management is an important part of project management,and schedule deviation is a most common phenomenon in project execution.Schedule deviations often lead to increase of project costs,decline of project quality,and extension of project duration,ultimately causing economic losses to investors.To prevent schedule deviations from happening,its root causes should be found out.In this paper,the statistical data of several EPC cases are analyzed to expose an in-depth view of the common factors behind schedule deviations,together with proposed countermeasures to correct these deviations.
作者 李如春 吴刚 丁艺飞 LI Ru-chun;WU Gang;DING Yi-fei(Wuhuan Engineering Co.,Ltd.,Wuhan Hubei 430223,China)
出处 《化肥设计》 CAS 2022年第2期59-62,共4页 Chemical Fertilizer Design
关键词 EPC总承包 项目进度管理 进度偏差 EPC contracting project schedule management schedule deviation
  • 相关文献

参考文献8

二级参考文献28

共引文献60

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部