摘要
本文以某尾矿库为工程背景,从技术、经济、安全、环保等方面,对初步选择的三种管道线路方案进行了综合比较和分析。结果表明,鉴于尾矿输送管线的限制条件更多,在尾矿设施管道工程线路方案选择上应优先考虑尾矿输送管道,尾矿库回水管线可与输送管线平行敷设;隧洞内管线敷设方案在初期工程投资上造价稍高,但在环境保护、管道安全以及后期运行费用方面更具有优势。
Aiming at the two most important types of pipeline projects in tailings facilities, namely the tailings transport pipeline and the tailings dam return water pipeline, this article gives an introduction to the principles that should be followed in the selection of the route schemes. In conjunction with a TSF project, and from the aspects of technology, economy, safety, environmental protection, etc., a comprehensive comparison and analysis of the three pipeline route schemes initially selected are carried out, and the analysis results show that priority should be given to tailings transportation pipeline when selecting TSF pipeline routing scheme since there are more restraints on tailings transport pipelines, and the tailings dam return water pipeline can be laid in parallel with the tailings transport pipeline;the pipeline running in the tunnels is slightly more expensive in terms of initial CAPEX, but it has more advantages in terms of environmental protection, pipeline safety and OPEX. Since the national and local government’s requirements for environmental protection and safety are getting increasingly stricter, it is a good way to properly consider the tunnel scheme in the selection of the TSF pipeline routing scheme, by taking into account factors such as economic conditions.
出处
《中国矿山工程》
2022年第1期94-97,共4页
China Mine Engineering
关键词
尾矿设施
管道工程
尾矿输送
线路方案
tailings facility
pipeline
tailings transport
routing scheme