期刊文献+

新疆莫莫克水利枢纽工程坝线地质条件比选 被引量:1

Comparison and Selection of Geological Conditions of Dam Line of Momok Water Conservancy Project in Xinjiang
下载PDF
导出
摘要 新疆莫莫克水利枢纽工程是提孜那甫河上的控制性工程,起着龙头水库的重要作用,主要承担防洪、灌溉兼顾发电的工程任务。通过对坝址区详细地质勘察,从地形地貌、地层岩性、地质构造等方面对坝线地质条件进行分析,综合对比分析地质条件,两坝线工程地质条件相差不大,上坝线工程地质条件略优于下坝线,因此上坝线为推荐坝线。 Momok Water Conservancy Complex Project in Xinjiang is a control project on the Tizinafu River and plays an important role as the leading reservoir.It mainly undertakes the engineering tasks of flood control,irrigation and power generation.Through detailed geological investigation of dam site area,this paper analyses geological conditions of dam line from the aspects of topography and landform,stratum lithology,geological structure,etc.After comprehensive comparison and analysis of geological conditions,it is found that the engineering geological conditions of the two dam lines are not significantly different,and the engineering geological conditions of the upper dam line are slightly better than those of the lower dam line.Therefore,the upper dam line is recommended.
作者 张聚峰 ZHANG Ju-feng(Xinjiang Institute of Water&Hydropower Engineering Investigation,Design and Research,Urumchi 830000,China)
出处 《云南水力发电》 2022年第4期104-107,共4页 Yunnan Water Power
关键词 莫莫克 坝址区 地质条件 上坝线 Momok dam site area geological condition upper dam line
  • 相关文献

参考文献3

二级参考文献3

共引文献13

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部