抽水蓄能电站地下厂房大型双小车桥机负荷试验施工 被引量:1

Load Test Construction of Large Double Trolley Bridge Crane for Underground Powerhouse of Pumped Storage Power Station
下载PDF
导出
摘要 结合在广东清远抽水蓄能电站、广东阳江抽水蓄能电站的机电安装施工经验,总结了大型双小车桥机负荷试验施工方法质量管理的环节。从负荷试验负载平台,到试验流程的优化,并提出了一种适合抽水蓄能电站地下厂房大型双小车桥机负荷试验施工方法。负荷试验流程结合紧密,减少了负荷的多次增减工作。对于试验的进度及安全性保障较好,降低了人力资源及设备的投入。经济效益较好。 Based on the experience of mechanical and electrical installation and construction in Qingyuan Pumped Storage Power Station and Yangjiang Pumped Storage Power Station of Guangdong Province,this paper summarizes the quality management link of construction method for load test of large double-car bridge crane.The optimization from load test load platform to test flow has been completed,and a construction method suitable for load test of large double trolley bridge crane in underground powerhouse of pumped storage power station has been put forward.The load test process is tightly integrated,reducing multiple load increments and decreases.It ensures the test progress and safety,and reduces the investment of human resources and equipment.
作者 甘泉 GAN Quan(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第4期182-186,共5页 Yunnan Water Power
关键词 抽水蓄能电站 大型双小车桥机 负荷试验 工艺原理 试验流程优化 pumped storage power station large double trolley bridge crane load test process principle optimization of test flow
  • 相关文献

参考文献3

二级参考文献2

共引文献2

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部