金沙江某水电站10kV厂用电系统备自投设计优化 被引量:3

Design Optimization of Standby Automatic Switch for 10kV Power Supply System of a Hydropower Station in Jinshajiang
下载PDF
导出
摘要 在建设期间设备调试时发现,某大型水电站厂用电10kV备用电源自动投入装置设计存在装置开入接线复杂、逻辑不符合实际运行要求、10kV备自投与400V备自投动作延时配合不当等问题。结合电站厂用电系统联络方式、实际运行操作需求以及备自投装置的功能实现可能性,对前期设计的备自投逻辑进行了优化。通过一系列相关试验和投运后实际运行情况证明,经过优化的备自投逻辑符合功能要求。 During equipment commissioning during construction,it is found that problems exist in the design of automatic switching-in device for 10kV backup power supply of a large hydropower station,such as complex switching-in wiring of device,inconsistent logic with actual operation requirements,improper coordination between 10kV backup automatic switching-in device and delay action of 400V backup automatic switchingin device.The logic of automatic backup switching in the preliminary design is optimized in combination with the contact mode of the plant power system,the actual operation requirements and the possibility of realizing the function of the automatic backup switching device.Through a series of relevant tests and actual operation after putting into operation,it is proved that the optimized automatic backup switching logic meets the functional requirements.
作者 陈松松 王祖顺 CHEN Song-song;WANG Zu-shun(Wudongde Hydropower Plant,Luquan 651512,China)
机构地区 乌东德水力电厂
出处 《云南水力发电》 2022年第4期201-204,共4页 Yunnan Water Power
关键词 厂用电 备用电源 自动投入 功能要求 station service auxiliary power automatic switch functional requirement
  • 相关文献

参考文献5

二级参考文献7

共引文献18

同被引文献16

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部