摘要
以隧道工程为例,具体研究工程机械机电设备安装以及调试技术,指出在具体的安装调试作业过程中,需要做好前期准备工作,建立标准化作业体系,制订科学的安装调试方案,同时,要把控安装调试作业的关键点,以保障机电设备安装调试作业的质量,确保机电设备各项性能优良。
Taking tunnel engineering as an example,the installation and debugging technology of mechanical and electrical equipment of engineering machinery is studied in detail.It is pointed out that in the specific installation and commissioning operation process,it is necessary to make preliminary preparations,establish standardized operation system,formulate scientific installation and commissioning scheme,and control the key points of installation and commissioning operation,so as to ensure the quality of installation and debugging of mechanical and electrical equipment,to ensure that the performance of mechanical and electrical equipment is excellent.
作者
林克任
LIN Ke-ren(Zhongzi Huake Transportation Construction Technology Co.Ltd.,Beijing 100195,China)
出处
《工程建设与设计》
2022年第6期110-112,共3页
Construction & Design for Engineering
关键词
机电设备
安装作业
调试
质量
mechanical and electrical equipment
installation operations
debugging
quality