探究地铁机电安装工程中进度管理系统的应用

Application of Progress Management System in Metro Electromechanical Installation Engineering
下载PDF
导出
摘要 以某地铁机电安装工程为例,通过动态管理系统的应用,并配套相应的管理方法,完成了数据库建设,并以数据资料库为依托,有效促进了各工种之间的衔接,进而完成专业接口工作,并且有利于优化进度管理效果,能够有效提升施工管理水平,确保各项管理决策顺利推进。 Taking a subway mechanical and electrical installation project as an example, through the application of dynamic management system, and supporting the corresponding management methods, the database construction is completed. Based on the data database, it effectively promotes the connection between various types of work, and then completes the professional interface work, and it is beneficial to optimize the management effect, can effectively improve the level of construction management, and ensure the smooth progress of management decisions.
作者 罗小华 LUO Xiao-hua(Beijing Ruituo Electronic Technology Development Co.Ltd.,Beijing 100040,China)
出处 《工程建设与设计》 2022年第6期216-218,共3页 Construction & Design for Engineering
关键词 地铁 机电安装 进度管理 动态管理系统 subway electromechanical installation progress management dynamic management system
  • 相关文献

参考文献3

二级参考文献15

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部