以某地铁机电安装工程为例,通过动态管理系统的应用,并配套相应的管理方法,完成了数据库建设,并以数据资料库为依托,有效促进了各工种之间的衔接,进而完成专业接口工作,并且有利于优化进度管理效果,能够有效提升施工管理水平,确保各项管理决策顺利推进。
Taking a subway mechanical and electrical installation project as an example, through the application of dynamic management system, and supporting the corresponding management methods, the database construction is completed. Based on the data database, it effectively promotes the connection between various types of work, and then completes the professional interface work, and it is beneficial to optimize the management effect, can effectively improve the level of construction management, and ensure the smooth progress of management decisions.