期刊文献+

煤矿巷道掘进速度影响因素与对策分析 被引量:4

Influencing Factors and Improving Measures of Driving Speed of Coal Mine Roadways
下载PDF
导出
摘要 随着采煤技术的不断应用与推广,煤矿巷道掘进速度将实现新的突破。为有效提高煤矿开采效率,避免采掘接替紧张的状况,从煤矿巷道掘进速度现状入手,分析了影响煤矿巷道掘进速度的因素,如地质因素、技术因素、人为因素,总结了解决煤矿巷道掘进速度较慢的对策,从而提高煤矿巷道开采速度,提升煤矿开采产量和质量。 With the continuous application and promotion of coal mining technology,the tunneling speed of coal mines will achieve new breakthroughs.In order to effectively improve the efficiency of coal mine mining and avoid the tense replacement of mining and driving,starting from the current situation of coal mine roadway driving speed,this paper analyzed the factors affecting the coal mine roadway driving speed,such as geological factors,technical factors,human factors,and summarized the countermeasures solving the low driving speed of coal mine roadways,thereby improving the mining speed of coal mine roadways,and improving the output and quality of coal mining.
作者 张伟 ZHANG Wei(Yitang Mining Management Company,Shanxi Kaijia Group,Jiexiu 032000,Shanxi,China)
出处 《能源与节能》 2022年第4期43-45,共3页 Energy and Energy Conservation
关键词 煤矿开采 巷道掘进 采掘接替 影响因素 coal mining roadway driving replacement of mining and driving influencing factors
  • 相关文献

参考文献5

二级参考文献13

共引文献13

同被引文献30

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部