摘要 基坑开挖导致的土体卸载作用会引起邻近下卧既有隧道隆起变形,甚至会干扰隧道的正常运营.提出了一种基坑开挖引起下卧隧道纵向变形的简化计算方法,将隧道简化成无限长Euler-Bernoulli梁搁置在三参数的Kerr地基模型,提出了剪切层弯矩的计算假设,利用有限差分法并结合隧道两端的边界条件得到隧道纵向变形差分解.结果表明:与既有文献中有限元数据和实测数据对比,证明了Kerr地基模型的准确性;与将隧道简化成Euler-Bernoulli梁搁置在Pasternak地基模型相比,Kerr地基模型更具有优越性.地基模量、隧道埋深的增大会引起隧道纵向位移及内力的减小;隧道刚度的增大会引起隧道纵向位移的减小但会引起隧道内力的增大. The soil unloading effect caused by the adjacent excavation will influence both the uplift and the deformation of the adjacent existing tunnel, and even interfere with the normal operation of the tunnel. A simplified calculation method for the longitudinal deformation of the underlying tunnel caused by foundation pit excavation is proposed. The tunnel is simplified into an infinitely long Euler-Bernoulli beam resting on a three-parameter Kerr foundation model. The difference method is combined with the boundary conditions at both ends of the tunnel to obtain the longitudinal deformation difference decomposition of the tunnel. The accuracy of the proposed method is proved by comparing it with the finite element simulation method and some cases study. Compared with the tunnel simplified as the Euler-Bernoulli beam which is placed upon the existing Pasternak foundation model, the Kerr foundation model has more advantages. As the elastic modulus of soil mass and the depth of tunnel axis increase, the longitudinal deflection and the inner force of the tunnel will decrease. The inner force of the tunnel will increase with the increment of the stiffness of the tunnel.
作者 冯国辉 徐兴 侯世磊 范润东 杨开放 管凌霄 徐长节 FENG Guohui;XU Xing;HOU Shilei;FAN Rundong;YANG Kaifang;GUAN Lingxiao;XU Changjie(Research Center of Coastal and Urban Geotechnical Engineering,Zhejiang University,Hangzhou 310058,China;Center for Balance Architecture,Zhejiang University,Hangzhou 310028,China;Jiangxi Key Laboratory of Infrastructure Safety Control in Geotechnical Engineering,East China Jiaotong University,Nanchang 330013,China;Hangzhou Zhejiang University First Investigation and Design Co.,Ltd.,Hangzhou 310030,China;Fourth Engineering Co.,Ltd.,China Railway 14th Bureau Group,Jinan 250002,China;Zhejiang Hanghai Intercity Railway Co.,Ltd.,Jiaxing 314000,Zhejiang,China;Engineering Research and Development Centre for Underground Technology of Jiangxi Province,Nanchang 330013,China;State Key Laboratory of Performance Monitoring and Protecting of Rail Transit Infrastructure,East China Jiaotong University,Nanchang 330013,China)
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2022年第4期474-485,共12页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金-高铁联合基金(U1934208) 国家杰出青年科学基金(51725802) 浙江省自然科学基金委员会-华东院联合基金(LHZ19E080001) 国家自然科学基金(51878276) 临近深基坑交通荷载对土体力学特征影响及围护结构安全性研究(20192ACB20001) 浙江大学平衡建筑研究中心配套资金(20203512-10C)。
关键词 基坑开挖 既有隧道 EULER-BERNOULLI梁 Kerr地基模型 有限差分法 excavation existing tunnel Euler-Bernoulli beam Kerr foundation model finite different method