摘要 为了解决回采巷道变形严重、破坏大的问题,以正利煤业围岩为研究背景,利用数值模拟软件对不同巷道布设位置下的围岩塑性破坏范围及垂直应力分布进行分析。为了提升数值模拟精度,利用先前试验数据对模型物理参数进行属性设定,通过模拟研究发现,当回采巷道沿着巷道底板进行掘进时,此时的巷道塑性变形、巷道围岩垂直应力、围岩水平应力及充填体的破坏等均能满足巷道围岩控制要求,所以巷道位置布置在沿巷道地板进行掘进时位置为最佳。 In order to solve the problem of serious deformation and large damage of mining roadway, taking the surrounding rock of Zhengli Coal Industry as the research background, this paper uses the numerical simulation software to analyze the plastic failure range and vertical stress distribution of surrounding rock under different roadway layout positions. In order to improve the accuracy of numerical simulation, the physical parameters of the model are set by using the previous test data, through simulation research, it is found that when the mining roadway is driven along the roadway floor, the roadway plastic deformation, the vertical stress of roadway surrounding rock, the horizontal stress of surrounding rock and the damage of filling body can meet the requirements of roadway surrounding rock control.Therefore, the best roadway layout position is the roadway roof when driving.
作者 李剑 Li Jian(Lanxian Zhengli Coal Industry Co.,Ltd.,Shanxi Coking Coal Group Co.,Ltd.,Lvliang Shanxi 033500)
出处 《山西冶金》 CAS 2022年第1期131-132,135,共3页 Shanxi Metallurgy
关键词 数值模拟 围岩破坏 垂直应力 降本增效 numerical simulation surrounding rock failure vertical stress cost reduction and efficiency increase
  • 相关文献

参考文献4

二级参考文献23

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部