依托襄阳东西轴线沉管隧道项目,针对轴线干坞法管节浮运技术展开研究,提出了一种采用管面绞车换缆绞移出坞、浮运方法,并用双钢管+锚链连接的锚桩代替传统的混凝土锚块定位方案。通过对沉管浮运安装工序进行分析,探讨轴线干坞法管节浮运安装工期优化方案,为类似工程提供参考。
Based on Xiangyang east-west axis immersed tunnel project,the tunnel elements floating technology of axis dry-dock method was studied.A new method of tunnel elements undocking and floating was put forward by means of replacing cable with winch on the tunnel elements,and the traditional concrete anchor block was replaced by anchor pile of double steel tube+anchor chain connection.Through the analysis of the floating installation process of immersed tunnel elements,the time optimization scheme of floating and installation period of axial dry dock method tunnel elements was discussed,which provides reference for similar projects.
作者
仇正中
蒋贤德
王金绪
胡嘉懿
QIU Zheng-zhong;JIANG Xian-de;WANG Jin-xu;HU Jia-yi(CCCC Second Harbor Engineering Co.,Ltd.,Wuhan,Hubei 430040,China;Key Lab of Large-span Bridge Construction Technology,Ministry of Transportation,Wuhan,Hubei 430040,China;Research and Development Center of Transportation Industry of Intelligent Manufacturing Technologies of Transport Infrastructure,Wuhan,Hubei 430040,China;CCCC Highway Bridge National Engineering Research Centre Co.,Ltd.,Beijing 100120,China;Guangzhou Salvage Bureau,Guangzhou,Guangdong 510260,China;Hubei University of Arts and Science,Xiangyang,Hubei 441053,China)
出处
《中国港湾建设》
2022年第4期64-68,共5页
China Harbour Engineering
基金
中国交建强冲刷河段深厚强透水地层大型沉管隧道建设关键技术研究(2018-ZJKJ-17)。
关键词
轴线干坞法
沉管浮运
管面绞车
锚桩定位
工期优化
axial dry-dock method
floating transportation of tunnel elements
winch on tunnel elements
anchor pile positioning
time optimization