海上风电桩靴式导管架基础施工关键技术 被引量:8

Key Construction Technologies of the Offshore Wind Power Pile-shoe Jacket Foundation
下载PDF
导出
摘要 为解决复杂环境下海上升压站桩靴式导管架基础施工面临的调平难及水下灌浆难两个问题,开展了施工关键技术研究。首先,提出导管架套筒上部安装液压卡桩器的调平措施,沿每个套筒环向均匀分布8个液压缸组成液压卡桩装置,辅助调平导管架;其次,提出导管架桩套筒底部安装自封闭式封隔器,在水下灌浆中对环形空间的底部实现封堵,提高水下灌浆的质量。两项措施有效解决了上述关键技术难题。 To solve the construction difficulties of the pile-shoe jacket foundation of offshore booster station in complex conditions,key technologies such as the foundation leveling and underwater grouting are studied.Firstly,a leveling method by installing a hydraulic pile clamp on the upper part of the jacket sleeve is proposed,in which eight hydraulic cylinders are evenly distributed along the circumferential direction of each sleeve to form a hydraulic pile clamping device to assist the jacket leveling.Secondly,self-enclosed packer is installed at the bottom of the jacket pile sleeve to block the bottom of the annular space during the underwater grouting and thus improve the grouting quality.With the proposed two measures,the construction difficulties are effectively solved.
作者 刘宏洲 王峡平 洛成 李令 葛畅 LIU Hongzhou;WANG Xiaping;LUO Cheng;LI Ling;GE Chang(Powerchina Huadong Engineering Corporation,Hangzhou 311122,China;Zhejiang East China Engineering Consulting Co.,Ltd.,Hangzhou 311122,China;Ocean College,Zhejiang University,Zhoushan 316021,China)
出处 《水电与新能源》 2022年第4期1-5,14,共6页 Hydropower and New Energy
基金 中国电建集团华东勘测设计研究院有限公司科技项目(KY2021-ZX-18)。
关键词 海上升压站 导管架基础 基础调平 水下灌浆 offshore booster station jacket foundation foundation leveling underwater grouting
  • 相关文献

参考文献14

二级参考文献68

共引文献83

同被引文献68

引证文献8

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部