摘要
针对近两年发现的一二次融合柱上开关重大设备质量问题,对一二次融合柱上开关内部互感器结构及原理进行分析,通过试验及解体检查分析温升试验不合格的根本原因,最后从试验标准、抽检策略与试验方法等方面提出改进建议。
In view of the major equipment quality problems found in the past two years,the structure and principle of the internal transformer of the primary-secondary fused pole-mounted switch are analyzed.This paper analyzes the root cause of unqualified temperature rise test through test and disassembly inspection,and finally puts forward improvement suggestions from test standard,sampling inspection strategy and test method.
作者
由凯
陈伟
王欢
胡加瑞
邓稳星
陈小容
YOU Kai;CHEN Wei;WANG Huan;HU Jiarui;DENG Wenxing;CHEN Xiaorong(State Grid Hunan Electric Power Company Limited Research Institute,Changsha 410007,China;Military Representative Office of Army Equipment Department in Changsha,Changsha 410000,China;State Grid Hunan Electric Power Company Limited,Changsha 410004,China;Hunan Xiangdian Test and Research Institute Co.,Ltd.,Changsha 410004,China)
出处
《湖南电力》
2022年第2期105-108,共4页
Hunan Electric Power
关键词
物资抽检
柱上开关
互感器
温升试验
sampling inspection
pole-mounted switch
transformer
temperature rise test