敞开式TBM大坡度掘进施工特征研究

Research on Construction Characteristics of Open TBM with Large Slope
下载PDF
导出
摘要 鉴于矿井采用斜井开拓方式,TBM开挖过程难免遇到地层应力随掘进轴线而变化的工况。为探究敞开式TBM斜井掘进期施工特征,本文以实际工程为背景,针对现场监测条件不足等难题,并考虑各施工部件材料几何特性及掘进步序,建立三维数值模型对施工动态进行全面把握。数值模拟结果表明:TBM在大坡度掘进施工时难免对周围岩层造成影响,围岩位移场及应力场分析为超前施工与加固提供了技术支持;喷射混凝土其内力处于允许范围,通过分析锚杆、锚索应力特征可推断出超前加固的重要性;规范施工是保证大坡度TBM快速掘进的基本前提。 In view of the mine adopts inclined shaft development mode,the stress will inevitably vary with the axis of the tunnel during the TBM excavating.In order to explore the open TBM construction characteristics of inclined shaft tunneling period,based on the actual project as the background,and aiming at the difficulties such as insufficient field monitoring conditions,a three-dimensional numerical model is established to fully grasp the dynamic construction.The model established in this paper takes into account the material geometry characteristics and excavation progress of each construction component.The simulation results show that TBM will inevitably affect the surrounding rock strata during the construction of large slope engineering.The displacement and stress fields of surrounding rock provide technical support for advanced construction and reinforcement.The internal force of shotcrete is within the allowable range,and the importance of this process can be deduced from the analysis of the stress characteristics of anchor bolt and anchor cable.Standard construction is the basic premise to ensure the rapid construction of TBM with large slope.
作者 李安云 康元锋 晁林 LI Anyun;KANG Yuanfeng;CHAO Lin(China Railway 15^(th) Bureau Group Co.Ltd.,Shanghai 200070,China)
出处 《铁道建筑技术》 2022年第4期133-136,共4页 Railway Construction Technology
基金 中铁十五局集团有限公司科技研发计划项目(2021A1,2021C61)。
关键词 敞开式TBM 大坡度 锚杆 喷射混凝土 数值模拟 open TBM large slope anchor bolt shotcrete numerical simulation
  • 相关文献

参考文献10

二级参考文献111

共引文献126

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部