摘要
根据常见人防工程3种通风方式下电气设备运行情况取不同的需要系数,分析、总结不同通风方式下的战时负荷计算,从而确保负荷计算更加准确、合理。并通过计算示例分析3种通风方式下战时负荷的计算,以此计算数据作为选择战时电力总负荷及柴油发电机组台数、容量的依据。
According to the operation conditions of electrical equipment under 3 ventilation methods in common civil air defense works,this paper analyzes and summarizes the wartime load calculation under different ventilation methods,ensuring that the load calculation is more accurate and appropriate.Besides,this paper analyzes the wartime load calculation under 3 ventilation methods through the calculation examples,and such calculation data are adopted as the evidence for selecting the wartime total power load and quantity and capacity of diesel generator units.
作者
杨金宝
张虎
吴彬
YANG Jinbao;ZHANG Hu;WU Bin(Lanzhou Urban Construction Design Institute,Lanzhou 730050,China)
出处
《建筑电气》
2022年第4期48-52,共5页
Building Electricity
关键词
人防工程
通风方式
设备运行
柴油发电机组
战时负荷
负荷计算
需要系数
选择依据
civil air defense works
ventilation methods
equipment operation
diesel generator unit
wartime load
load calculation
demand factor
basis for selection