现代有轨电车建设时序确定方法研究 被引量:1

Construction Schedule Method for Modern Tram
下载PDF
导出
摘要 许多城市往往是凭借经验规划建设现代有轨电车,针对目前有轨电车线路存在的乘客体验性差、未达到预期客流强度以及线路规划不合理等问题,本文提出了一种全新的有轨电车建设时序确定方法。首先对现代有轨电车在城市发展中的功能定位进行识别,不同的功能定位将影响有轨电车的建设时序;在此基础上研究了有轨电车的建设时序方案,通过分析有轨电车建设过程中的影响因素,提出了确定有轨电车建设时序方案的三大原则及制定方案的指导思想;最后通过建立基于加权灰色关联-理想解的现代有轨电车建设时序模型,对生成的备选方案集进行综合评价,从而确定最合理的有轨电车建设时序方案。 Many cities often rely on experience to plan and construct modern trams. In view of the problems of poor passenger experience, not meeting the expected passenger flow intensity and unreasonable line planning, this paper proposes a new tram line. Method for determining the time sequence of tram construction. Firstly, the functional positioning of modern trams in urban development is identified. Different functional positioning will affect the construction sequence of trams. On this basis,the construction sequence scheme of trams is studied. By analyzing the construction process of trams Influence factors in this paper, three principles for determining the time sequence scheme of tram construction and the guiding ideology for formulating the scheme are put forward. Set a comprehensive evaluation to determine the most reasonable tram construction sequence plan.
作者 邱海童 郑昭 孙瑞 Qiu Haitong;Zheng Zhao;Sun Rui(Modern Tramway Co.LTD of Beijing Public Transport,Beijing 100080;Beijing Rail and Transit Design&Research Institute CO.LTD,Beijing 100068)
出处 《城市公共交通》 2022年第4期35-39,43,共6页 Urban Public Transport
关键词 有轨电车 建设时序 功能定位 确定原则 指导思想 Tram Construction schedule Functional positioning Determining principles Guiding ideology
  • 相关文献

参考文献6

二级参考文献42

共引文献33

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部