摘要
这篇文章主要采用了层次和态势分析的方法,建立了AHP-SWOT模型展开相应的分析,并对文章中所列举的案例展开了系统性的分析,根据分析结果,提出采用W-T(应对威胁、克服劣势)要采用防御性战略来进一步应对文章所列举实例中的王宅水库展开除险加固的相关施工内容,同时以模糊评价分析法作为研究的基础,对完成项目施工后的质量展开了科学的分析评价。结果表明:有35.2%的调查对象对该项目的施工质量都比较满意,因此,可以判定该项目施工质量已经基本达到了相关的标准要求。
This article mainly adopts the method of level and situation analysis,establishes the AHP-SWOT model to carry out corresponding analysis,and systematically analyzes the cases listed in the article.Threats and overcoming disadvantages should adopt a defensive strategy to further deal with the relevant construction content of Wangzhai Reservoir in the example listed in the article,and at the same time,based on the fuzzy evaluation analysis method,the quality of the project after the construction is completed.scientific analysis.The results show that 35.2%of the respondents are satisfied with the construction quality of the project.Therefore,it can be determined that the construction quality of the project has basically reached the relevant standard requirements.
作者
吴凯
王传良
WU Kai;WANG Chuan-liang(Yunnan Water Conservancy and Hydropower Engineering Co.,Ltd.,Kunming 650000,China)
出处
《价值工程》
2022年第17期30-32,共3页
Value Engineering
关键词
层次分析法
态势分析法
小型水库
除险加固
analytic hierarchy process
situation analysis method
small reservoir
danger elimination and reinforcement