期刊文献+

建设工程项目总承包管理组织结构优化研究

Research on the Optimization of General Contracting Management Organization Structure of Construction Engineering Projects
下载PDF
导出
摘要 当前,建筑业形势正在发生变化,建设工程项目呈现出总承包一体化、技术工艺复杂化和产业分工专业化等特点,客观上要求工程管理系统化、科学化和标准化。组织是管理当中最为基础的问题,欲提升总承包管理能力,必先解决总承包管理组织结构问题。论文以某总承包公司M为例,对工程项目总承包管理组织结构存在的问题进行了研究,通过深入挖掘系统组织思想等前沿理论,分析其与组织结构优化的结合点,提出了总承包管理组织结构的优化措施。 At present,the situation of building industry is changing.Construction engineering projects show the characteristics of integration of general contracting,complexity of technology and process and specialization of industrial division,which objectively requires systematic,scientific and standardized engineering management.Organization is the most basic problem in management.In order to improve the general contracting management ability,we must firstly solve the problem of general contracting management organization structure.Taking M General Contracting Company as an example,the paper studies the problems existing in the general contracting management organization structure of engineering projects.By digging deeper into the frontier theories such as system organization thought,this paper analyzes the point of combining it with the optimization of the organization structure,and proposes the optimization measures of the general contracting management organization structure.
作者 王琰玮 WANG Yan-wei(China Railway 23rd Bureau Group No.6 Engineering Co.,Ltd.,Chongqing 401121,China)
出处 《中小企业管理与科技》 2022年第4期70-73,共4页 Management & Technology of SME
关键词 建筑工程 总承包 组织优化 企业管理 building engineering general contracting organization optimization enterprise management
  • 相关文献

参考文献5

二级参考文献37

  • 1赵琳.谈大型建设项目的扁平化组织结构构建[J].建筑经济,2008,29(S2):227-229. 被引量:6
  • 2左海青.建设项目应注重技术创新和管理创新[J].山东冶金,2002,24(2):34-35. 被引量:1
  • 3许庆瑞,郑刚,陈劲.全面创新管理:创新管理新范式初探——理论溯源与框架[J].管理学报,2006,3(2):135-142. 被引量:104
  • 4雷晓莉.基于耗散结构的企业动态竞争优势分析[J].商业时代,2007(11):41-42. 被引量:1
  • 5Sven Bertelsen, Construction as a complex system[C]. The 1 lth annual conference of the International Group for Lean Construction. Virginia: the International Group for Lean Construction, 2003.
  • 6Julien Pollack, The changing paradigms of project management[J] . International Journal of Project Management, 2007, 25 (3). 266-274.
  • 7F. Jolivet, C. Navarre, Large-scale projects, self-organizing and meta-rules: towards new forms of management[J]. International Journal of Project Management, 1996, 14 (5): 265-271.
  • 8T. Hwa, M. Kardar, Dissipative transport in open systems - an investigation of self-organized criticality[J]. Physical Review Letters, 1989, 62 (26): 1813-1816.
  • 9Xu, H. C., Lin, J. C. Dissipation analysis about construction project organization[C] . Intematioanl Conference on Engineering and Business Management, 2010, 1925-1929.
  • 10E. C. Wenger, W. M. Snyder, Communities of practice: the organizational frontier. Harvard Business Review, 2000, 78 ( 1 ): 139-145.

共引文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部