结合内蒙古京海煤矸石发电有限责任公司2×330 MW热电联产项目实例,分析了城市中水作为生产水源后,京海电厂的水处理工艺流程及对锅炉补给水处理系统、循环冷却水系统的影响。通过水处理运行方式的改进及优化,实现了城市中水的正常应用。
Taking a 2×330 MW cogeneration project of Jinghai Coal Gangue Power Generation Co.,Ltd.in Inner Mongolia as an example,water treatment process and the influence on boiler make-up water treatment system and circulating cooling water system of Jinghai Power Plant are analyzed after urban reclaimed water is used as the source of production.And the normal application of urban water is realized through the improvement and optimization of water treatment operation mode.
作者
贺爽
罗瑞成
HE Shuang;LUO Ruicheng(Inner Mongolia Jinghai Coal Gangue Power Generation Co.,Ltd.,Wuhai,Inner Mongolia 016000,China)
出处
《山西电力》
2022年第2期65-69,共5页
Shanxi Electric Power
关键词
城市中水深度处理
火力发电厂
锅炉补给水处理
循环冷却水
advanced treatment of urban reclaimed water
thermal power plant
boiler make-up water treatment
circulating cooling water