期刊文献+

具有工作站数量约束的多人工作站混合装配线平衡问题研究 被引量:2

Research on the Multi-manned Mixed-model Assembly Line Balancing Problem with the Workstation Quantity Constraint
下载PDF
导出
摘要 针对装配线设计或改造过程中存在的因场地或成本原因导致的工作站数量不易变更的问题,研究了节拍已知情况下,具有工作站数量约束的多人工作站混合装配线平衡问题,建立以装配线总人数最小、工人负荷量标准差最小、各产品在各工作站装配时间与节拍之间的标准差最小为目标的数学模型,设计了一种结合差分进化的多目标混合遗传算法对该问题求解。通过案例计算以及与其他算法的对比分析表明,本文算法在收敛性和综合性能方面优于NSGAII和DEMO,在装配线人数和工人负荷标准差方面优于Roshani和Nezami提出的算法。 Workstations of some assembly line are not easy to change in the process of design and upgrading because of space or cost limit.The multi-manned mixed-model assembly line balancing problem with the workstation quantity constraint is studied under the condition of known cycle time.A mathematical model of multi-manned mixed model assembly line balance problem is established with minimizing objectives.These objectives include total number of assembly line workers,standard deviation of workers’load and sum of standard deviation between assembly time of different products and cycle time.A hybrid multi-objective genetic algorithm combined with differential evolution is designed to solve the problem.The model and algorithm prove to be valid by calculating the example and comparing with other algorithm.The algorithm is superior to NSGAII and DEMO in convergency and comprehensive performance,and stays ahead of the method which is proposed by Roshani and Nezami in total number of assembly line workers and standard deviation of workers’load.
作者 赵文燕 张世哲 师柳柳 ZHAO Wen-yan;ZHANG Shi-zhe;SHI Liu-liu(School of Economics and Management, Hebei University of Technology, Tianjin 300401, China)
出处 《运筹与管理》 CSSCI CSCD 北大核心 2022年第4期41-48,共8页 Operations Research and Management Science
基金 教育部人文社会科学研究青年基金项目(19YJC630117)。
关键词 混合装配线 多人工作站 混合遗传算法 多目标问题 mixed-model assembly line multi-manned workstation hybrid genetic algorithm multi-object problem
  • 相关文献

参考文献1

二级参考文献9

  • 1皮兴忠,范秀敏,严隽琪.基于可行作业序列的遗传算法求解第二类装配线平衡问题[J].上海交通大学学报,2005,39(7):1123-1127. 被引量:21
  • 2Boysen N,Fliedner M,Scholl A.A classification of assembly line balancing problems[J].European Journal of Operational Research,2007,183(2):674-693.
  • 3Simaria A S,Vilarinho P M.The simple assembly line bal-ancing problem with parallel workstations—a simulated an-nealing approach[J].International Journal of Industrial Engi-neering:Theory Applications and Practice,2001,8(3):230-240.
  • 4Bukchin J,Rubinovitz J.A weighted approach for assembly line design with station paralleling and equipment selection[J].IIE Transactions,2003,35(1):73-85.
  • 5Ege Y,Azizoglu M,Ozdemirel N E.Assembly line balancing with station paralleling[J].Computers&Industrial Engineering,2009,57(4):1218-1225.
  • 6Akpinar S,Bayhan G M.A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel work-stations and zoning constraints[J].Engineering Applications of Artificial Intelligence,2011,24(3):449-457.
  • 7Kelleg z T,Toklu B.An efficient branch and bound algo-rithm for assembly line balancing problems with parallel multi-manned workstations[J].Computers and Operations Research,2012,39(12):3344-3360.
  • 8Scholl A.Homepage for assembly line optimization resear-ch[EB/OL] (.2008-07-05).http://www.assembly-line-balancing.de/.
  • 9李英德,鲁建厦.求解第二类装配线平衡问题的改进蚁群算法[J].计算机集成制造系统,2012,18(4):754-760. 被引量:10

共引文献2

同被引文献21

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部