摘要 为探析隧道工程TBM装机的重难点及组装施工的应用,结合工程实例,立足TBM装机重难点,分析了TBM组装施工以及调试的要点。分析得到:在隧道工程施工中,经常会用到TBM设备,但隧道空间有限,TBM装机难度比较大,需要结合隧道工程的实际情况,制定有效的组装施工方案,并加强调试,才能最大限上提升TBM的应用效果。 In order to analyze the key and difficult points of TBM installation and the application of assembly construction in tunnel engineering,the highlights of TBM assembly construction and commissioning are analyzed,based on engineering examples as well as the key and difficult points of installation.The analysis shows that TBM equipment is often used in tunnel construction,but the tunnel space is limited,which makes it difficult to install TBM. Therefore,it is necessary to formulate effective assembly construction scheme and strengthen debugging in combination with the actual situation of tunnel engineering,so as to maximize the application effect of TBM.
作者 韩小龙 HAN Xiao-long(Tunnel Engineering Co. Ltd., China Railway 18th Bureau Group, Chongqing 400700, China)
出处 《兰州石化职业技术学院学报》 2022年第1期17-20,共4页 Journal of Lanzhou Petrochemical Polytechnic
关键词 隧道工程 TBM 装机 组装 tunnel engineering TBM installation assemble
  • 相关文献

参考文献5

二级参考文献49

共引文献29

同被引文献6

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部