摘要
为建立采选充一体化示范工程质量监测与评价体系,选取了3个一级指标和16个二级指标,实时监测并记录工作面的指标数据。通过建立的采选充一体化质量评价模型计算得出工程完成质量评价结果,并采用MATLAB语言依据此评价体系和评价模型进行程序软件开发,以简化采选充一体化示范工程质量评价过程,提高评价效率。
In order to establish the quality monitoring and evaluation system of the integrated demonstration project of mining,selection and filling,three primary indicators and 16 secondary indicators are selected to monitor and record the index data of the working face in real time.Through the established integrated quality evaluation model of mining,dressing and charging,the project completion quality evaluation results are calculated,and the program software is developed based on the evaluation system and evaluation model in MATLAB language,so as to simplify the quality evaluation process of the integrated demonstration project of mining,selection and filling and improve the evaluation efficiency.
作者
冷超
徐小迪
Leng Chao;Xu Xiaodi(Shandong University of Science and Technology,Shandong Qingdao 266590)
出处
《山东煤炭科技》
2022年第4期185-187,共3页
Shandong Coal Science and Technology
关键词
“采选充”一体化
评价体系
质量监测
模糊综合评价
软件开发
integration of"mining
selection and filling"
evaluation system
quality monitoring
fuzzy comprehensive evaluation
software development