4Behrouzi F,Wong K Y. I.ean performance evalua tion of manufacturing systems:A dynamic and in novative approach [J]. Procedia Computer Sci ence, 2011,3 : 388-395.
5Hodge G L,Goforth R K,Joines J A,et al. Adap- ting lean manufacturing principles to the textile industry [J]. Production Planning : Control, 2011,22(3) :237-247.
6Zha J, Zeng X. Mixed-model U-line balancing and sequencing in lean production [C]. International Asia Conference on Industrial Engineering and Management Innovation(IEMI2012) Proceedings. Springer Berlin Heidelberg,2013.