隧道爆破振动现场监测及动力响应分析研究 被引量:1

Field Monitoring and Dynamic Response Analysis of Tunnel Blasting Vibration
下载PDF
导出
摘要 以楚雄段施工6标倒虹吸交通洞施工支洞区间隧道工程为背景,提出隧道爆破振动现场监测试验的可行性研究方案。通过现场试验对爆破振动速度和震率变化规律进行研究。详细分析了现场试验爆破点距离监测点距离处最大振动速度变化规律,发现爆破振动速度和震率符合M.A.萨道夫斯基地振动最大速度经验公式。 Based on the tunnel engineering of an inverted siphon access tunnel construction adit section,the feasibility study scheme of tunnel blasting vibration field monitoring test is proposed.Through the field test,the variation law of blasting vibration velocity and vibration rate is studied.The variation law of the maximum vibration velocity at the distance between the blasting point and the monitoring point in the field test is analyzed in detail.It is found that the blasting vibration velocity and vibration rate conform to the empirical formula of the maximum vibration velocity of M.A.dynamic response.
作者 赵智辉 刘跃成 杨金虎 康跃明 ZHAO Zhi-hui;LIU Yue-cheng;YANG Jin-hu;KANG Yue-ming(China Coal Technology Engineering Group Chongqing Research Institute,Chongqing 400039,China;Yunnan Transportation Investment Group Co.,Ltd.,Lincang,Yunnan 675800,China)
出处 《黑龙江交通科技》 2022年第3期102-104,共3页 Communications Science and Technology Heilongjiang
基金 云南省交通运输厅科技创新及示范项目(云交科教便[2020]59)资助。
关键词 爆破开挖 现场实验 爆破震速 动力响应 blasting excavation field experiment blasting velocity dynamic response