期刊文献+

有砟轨道轨道刚度与道床刚度实验研究 被引量:1

Research on rigidity of track and ballast bed of ballasted track
下载PDF
导出
摘要 目前传统的道床刚度测量方法较为繁琐,而轨道刚度测量相对简单。对此,文中进行了对轨道刚度以及道床刚度的现场试验,对轨道刚度与道床刚度之间的关系进行研究,研究过程得到了轨道压力和位移线性拟合后所得表达式与轨道刚度的关系,以及轨道刚度与道床刚度的定量实测关系,因此证明了道床的刚度可以通过间接测量轨道刚度来进行反推得之,从而一定程度上提高了道床刚度的测量效率,对有砟轨道的建设以及维护具有一定的实际意义。 At present,the traditional measurement method of track bed stiffness is rather cumbersome,while the measurement of track stiffness is relatively simple.Therefore,in this paper,the field test of track stiffness and ballast stiffness is carried out,and the relationship between track stiffness and ballast stiffness is studied,and the relationship between track stiffness and the expression obtained after linear fitting of track pressure and displacement,as well as the quantitative measured relationship between track stiffness and ballast stiffness are obtained.Therefore,it is proved that the stiffness of ballast stiffness can be inversely deduced by indirect measurement of track stiffness,thus improving the measurement efficiency of ballast stiffness to a certain extent,which has certain application significance for the construction and maintenance of ballasted track.
作者 李帆 王少华 杜佳桥 Li Fan;Wang Shaohua;Du Jiaqiao
出处 《起重运输机械》 2022年第8期67-70,共4页 Hoisting and Conveying Machinery
关键词 有砟轨道 轨道刚度 道床刚度 测量效率 man-machine ballasted track track stiffness rigidity of track bed measurement efficiency
  • 相关文献

参考文献3

二级参考文献25

  • 1赵国堂.铁路轨道刚度的确定方法[J].中国铁道科学,2005,26(1):1-6. 被引量:84
  • 2TB2034—88.铁路轨道强度检算法[S].[S].,..
  • 3曾树谷.轨道结构的基本力学参数[A]..铁道部科学研究院铁道建筑研究所论文集(第三集铁路轨道)[C].北京:中国铁道出版社,1990..
  • 4Pandrol公司.Pandrol轨下弹性橡胶垫板供货条件[R].UnitedKingdom:Pandrol,2001..
  • 5Esveld C. Modem Railway Track (Second Edition) [M]. Delft MRT-Production, 2001, 441--454.
  • 6AS4292-4, National Code of Practice for Railways[S].
  • 7Fortin J P. Dynamic Track Deformation [J]. French Railway Review, 1983, 1 (1): 76--86.
  • 8Kenney J T. Steady-state Vibrations of Beam on Elastic Foundation for Moving Load [J]. Journal of Applied Mechanics,1954, 21 (12): 36--43.
  • 9Esveld C. Innovation for the Control of Infrastructure Maintenance [J]. Rail International, 1996, (12): 10--15.
  • 10Lopez Pita A. The Vertical Stiffness of the Track and the Deterioration of High-Speed Lines [J]. Revista de Obras Publicas, 2001, (11): 7--22.

共引文献86

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部