摘要
为确保南水北调中线总干渠运行安全,正确认识高地下水位带来的危害,结合郑州高地下水位渠段运行情况,采取工程和调度相结合措施,减小地下水位抬升产生顶托力对衬砌面板的破坏。
In order to ensure the operation safety of the main canal in the middle route of the South-to-North Water Transfer Project and correctly understand the harm caused by the high groundwater level,combined with the operation of the high groundwater level canal section in Zhengzhou,the combination of engineering and dispatching measures are taken to reduce the damage of the jacking force caused by the rise of the groundwater level to the lining panel.
作者
孙超
刘淼森
申粤
SUN Chao;LIU Miaosen;SHEN Yue(Henan Vocational College of Water Conservancy and Environment,Zhengzhou 450008,China;Henan Branch of Construction Administration Bureau of the Middle Route of South-to-North Water Transfer Project,Zhengzhou,450046,China)
出处
《河南科技》
2022年第7期79-82,共4页
Henan Science and Technology
关键词
南水北调中线
高地下水位
危害
措施
the middle route of the South-to-North Water Transfer Project
high groundwater level
harm
measures