基于作业成本法的建筑施工企业项目成本核算研究——以Z集团公司DX工程项目为例 被引量:5

Research on Project Cost Accounting of Construction Enterprises Based on Activity-based Costing:Take the DX Engineering Project of Z Group Company as an Example
下载PDF
导出
摘要 由于我国的建设项目具有参与主体多、施工流程复杂、建设周期长、投资体量大的特点,所以,结果导向的传统成本法越来越不能满足建筑行业全生命周期成本控制的发展需要。本文以Z集团公司DX工程项目为例,论证实践过程中作业成本法的具体应用,提出实施的保障措施,再一次印证了作业成本法在建设项目中的可行性。 Due to the characteristics of many participants,complex construction process,long construction period and large investment volume in China's construction projects,the result-oriented traditional cost method is increasingly unable to meet the development needs of the construction industry's full life cycle cost control.This paper takes the DX engineering project of Z Group Corporation as an example to demonstrate the specific application of the activity-based costing method in the practice process,and puts forward the safeguard measures for implementation,which once again confirms the feasibility of the activity-based costing method in the construction project.
作者 袁化一 翟曜 张起超 YUAN Hua-yi;ZHAI Yao;ZHANG Qi-chao(Inner Mongolia Agricultural University,Hohhot 010018,China)
机构地区 内蒙古农业大学
出处 《价值工程》 2022年第18期29-31,共3页 Value Engineering
关键词 建筑项目 作业成本法 成本控制 construction project activity-based costing cost control
  • 相关文献

二级参考文献2

共引文献133

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部