摘要
随着环保要求的日益严格,原料场封闭棚化势在必行。本文结合工程实例,对大跨度料场封闭网壳结构设计与施工进行了介绍,从计算模型、程序软件、风洞试验、计算结果及施工方案的比选等方面进行论证和优化,可供有关技术人员借鉴参考。
With the increasingly stringent environmental requirements,raw materials field closed canopy is imperative.In this paper,it introduces the design and construction of large-span yard closed net shell structure combined with engineering example,from calculation model,application software,wind tunnel test,results and comparison of the construction scheme argumentation and optimization.This can be a reference for the relevant technical personnel.
作者
刘琦
田明强
杨宏楠
刘西斌
刘建新
Liu Qi;Tian Mingqiang;Yang Hongnan;Liu Xibin;Liu Jianxin(Tangsteel International Engineering Technology Corp.,Tangshan 063000,Hebei;Shijiazhuang Juli Technohogy Co., Ltd., Shijiazhuang 050000,Hebei)
出处
《河北冶金》
2022年第4期67-70,共4页
Hebei Metallurgy
关键词
大跨度
原料场
网壳结构
封闭
风荷载
滑移法
large-span
raw materials yard
reticulated shell
closed
wind load
slip method