摘要
利用BIM设计软件具有可视性、直观性、参数驱动性的特点,驱动设计方案的快速变更,结合水电站地下洞室特点,提出了一套适合工程技术人员的定位关键块体分析方法,经过工程应用、可明显提高现场服务的响应速度,可为地下工程块体分析提供借鉴。
Taking advantage of the characteristics of visibility,intuition and parameter-driven of BIM design software to drive the rapid change of the design scheme,combined with the characteristics of the underground cavern of the hydropower station,a set of analysis methods suitable for engineers and technicians to locate key blocks was proposed.After engineering application,the response speed of on-site service can be significantly improved,and it can provide reference for the analysis of underground engineering blocks.
作者
杨东升
费秉宏
孙春华
YANG Dongsheng;FEI Binghong;SUN Chunhua(PowerChina Northwest Engineering Corporation Limited, Xi'an 710065,China)
出处
《西北水电》
2022年第2期81-85,共5页
Northwest Hydropower
关键词
BIM
地下洞室
关键块体
结构面
BIM
underground cavern
key block
structural plane