摘要 研究目的:为满足客货运量运输需求并预留长远发展条件,部分线路近期修建为单线,预留双线建设条件,线路开通运营后择机适时增建Ⅱ线。单线预留双线铁路需统筹各区段近远期运输需求、Ⅰ线和Ⅱ线工程及实施条件,合理确定车站分布、Ⅱ线预留线位及近期同步实施工程。本文通过衢宁铁路线路方案研究,对单线预留双线铁路设计方法进行探讨。研究结论:单线预留双线铁路不仅需要设计好Ⅰ线,还需要预留好Ⅱ线条件。(1)应明确预留Ⅱ线同步实施工程范围,根据Ⅰ线的隧道、桥梁、车站等工程的难易程度,综合比选确定Ⅱ线的左右侧;(2)应尽量减少换侧的次数,并结合具体情况选择好换侧地点;(3)进行Ⅱ线工程预设计时应尽量减少预留Ⅱ线同步实施工程,确有必要时进行工程预留;(4)本研究可为类似单线预留双线铁路设计提供借鉴和参考。 Research purposes:In order to meet the demand of passenger and freight volume and reserve long-term development conditions,part of the railways will be built as single track in the near future,and double track construction conditions will be reserved.The second track will be built at the right time after the railway is put into operation.The single track reserved double track railway needs to coordinate the short-term and long-term transportation demand of each section,the project and implementation conditions of first track and second track,and reasonably determine the station distribution,reserved line position of second track and the recent simultaneous implementation of the project.Through the study of Quzhou-Ningde railway line scheme,this paper discusses the design method of single track reserved double track railway.Research conclusions:Single track reserved double track railway not only needs to design the first track,but also needs to reserve the conditions of the second track.(1)It is necessary to define the scope of simultaneous implementation of the second track.According to the difficulty degree of tunnel,bridge and station engineering of the first track,the left and right sides of the second track are determined by comprehensive comparison.(2)We should try to reduce the times of side changing,and choose the place of side changing according to the specific situation.(3)During the pre design of reserved second track,it is necessary to minimize the simultaneous implementation of the second track and the project shall be reserved when necessary.(4)This study can provide reference for the design of similar single track reserved double track railway.
作者 秦国强 QIN Guoqiang(China Railway Siyuan Survey and Design Group Co.Ltd,Wuhan,Hubei 430063,China)
出处 《铁道工程学报》 EI 北大核心 2022年第2期19-23,共5页 Journal of Railway Engineering Society
关键词 单线预留双线铁路 线路方案 同步实施工程 single track reserved double track railway line scheme simultaneous implementation of the project
  • 相关文献

参考文献5

二级参考文献25

  • 1黄世明.宝成铁路增建第二线的选线问题[J].铁道工程学报,1996,13(3):46-52. 被引量:1
  • 2李广.我国山区铁路的选线问题[J].铁道工程学报,1992,9(3):136-141. 被引量:1
  • 3朱颖,王国生.铁路设计理念的回顾和展望[J].铁道工程学报,2007,24(1):1-5. 被引量:15
  • 4铁道部令第29号,铁路技术管理规程[S].
  • 5铁建设[2007]47号,时速300-350公里客运专线铁路设计暂行规定[S].
  • 6中铁二院工程集团有限责任公司,重钢环保搬迁工程初步设计[z].成都:中铁二院工程集团有限责任公司,2008.
  • 7中铁二院工程集团有限责任公司,西成客运专线初步设计[Z].成都:中铁二院工程集团有限责任公司,2009.
  • 8中铁二院工程集团有限责任公司,成都枢纽货车外绕线工程初步设计[Z].成都:中铁二院工程集团有限责任公司,2008.
  • 9中铁二院工程集团有限责任公司,兰渝线初步设计[Z].成都:中铁二院工程集团有限责任公司,2008.
  • 10中铁二院工程集团有限责任公司.长昆客运专线初步设计[z].成都:中铁二院工程集团有限责任公司.

共引文献93

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部