摘要 为了缩短变电站10 kV转运小车操作时升降平台的调节时间,提高转运小车的对位操作效率,在升降平台前端边沿加装一个水平尺,在承载设备的10 kV转运小车进行对位操作前,利用水平尺提前对升降平台进行快速找平。改进前升降平台的调节找平时间为120 s,改进后仅需30 s,操作效率提高了3倍。 In order to shorten the adjustment time of the lifting platform during the operation of the 10 kV transfer trolley in the substation and improve the alignment operation efficiency of the transfer trolley,a level ruler is installed at the front edge of the lifting platform.Before the alignment operation of the 10 kV transfer trolley carrying equipment,the level ruler is used to quickly level the lifting platform in advance.Before the improvement,the adjustment and leveling of the lifting platform takes 120 s.After the improvement,it only takes 30 s,and the operation efficiency is increased by 3 times.
作者 尤敏 韩鹏 李雄 严双喜 朱容 王志华 YOU Min;HAN Peng;LI Xiong;YAN Shuangxi;ZHU Rong;WANG Zhihua(State Grid Hangzhou Lin'an Power Supply Co.,Ltd.,Hangzhou 311300,China;School of Electrical Engineering,Hebei University of Technology,Tianjin 300130,China)
出处 《电工技术》 2022年第8期96-97,共2页 Electric Engineering
基金 国家自然科学基金(编号51775166)。
关键词 变电站 转运小车 水平尺 操作效率 可靠性 transformer substation transfer trolley level ruler operational efficiency reliability
  • 相关文献

参考文献3

二级参考文献15

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部