可靠度约束下的不完全预防更换维修模型 被引量:4

IMPERFECT PREVENTIVE REPLACEMENT MAINTENANCE MODEL UNDER RELIABILITY CONSTRAINTS
下载PDF
导出
摘要 针对可修系统因维修更换计划不合理而导致的不能充分利用设备剩余寿命问题,在综合考虑动态维修成本和可靠度的基础上,提出一种可靠度约束下的不完全预防更换维修方法,建立基于混合故障率的非等周期不完全预防维修模型。以可靠度为约束,给出设备更换维修周期的计算公式,采用枚举法给出最优更换阈值;以平均维修成本最小为目标,给出最佳预修次数、预修周期和更换周期。以某风力机的发电机为例,将该模型与无可靠度约束模型和未考虑更换阈值模型进行对比分析,结果表明所提方法在保证设备可靠运行的同时,有效降低了维修成本。 Aiming at insufficient using the remaining life of the equipment used insufficiently in repairable systems due to unreasonable maintenance and replacement plans,on the basis of comprehensive consideration of dynamic maintenance costs and reliability,an incomplete preventive replacement maintenance method under reliability constraints is proposed.A non-equal cycle imperfect preventive maintenance(PM)model based on mixed failure rate is developed as well.Furthermore,the calculation formula of the equipment replacement maintenance period is given on basis of the constraint of reliability,while the optimal replacement threshold is raised by enumeration method.Moreover,with the minimum average maintenance cost as the goal,the optimal number of PM,PM period and replacement cycle are provided.In addition,taking the generator of a wind turbine as an example,the model is compared with PM model without reliability constraints and the model without replacement threshold.The results indicate that proposed methodology effectively reduces maintenance costs and guarantees the reliable operation of the equipment.
作者 李建华 徐家生 任丽娜 Li Jianhua;Xu Jiasheng;Ren Li’na(School of Mechanical and Electrical Engineering,Lanzhou University of Technology,Lanzhou 730050,China)
出处 《太阳能学报》 EI CAS CSCD 北大核心 2022年第4期446-452,共7页 Acta Energiae Solaris Sinica
基金 国家重点研发计划(2018YFB1309005)。
关键词 可靠度 风电机组 预防性维修 更换周期 混合故障率 reliability wind turbines preventive maintenance replacement cycle hybrid hazard rate
  • 相关文献

参考文献10

二级参考文献94

  • 1赵永强,梁工谦.可靠性及动态维修成本下的定期预防维修研究[J].航空制造技术,2012,55(7):89-91. 被引量:4
  • 2康健,周振华.基于费用最小的列控设备维修优化与仿真[J].铁道标准设计,2012,32(12):92-95. 被引量:5
  • 3毛昭勇,宋保维,李正,胡海豹.并联系统预防性维修费用的优化方法[J].系统仿真学报,2005,17(4):819-821. 被引量:10
  • 4Das K, Lashkari R S, Sengupta S. Machine reliability and preventive maintenance planning for cellular manufacturing systems[ J]. European Journal of Operation Research,2007, 183( 1 ) :162-180.
  • 5Beaurepaire P, Valdebenito M A, Schueller G I, et al. Reli- ability-based optimization of maintenance scheduling of me- chanical components under fatigue [ J ]. Computer Methods Applied Mechanics and Engineering, 2012,221-222:24-40.
  • 6Mercier S, Pham H H. A preventive maintenance policy for a continuously monitored systems with correlated wear indica- tors [ J ], European Journal of Operational Research, 2012, 222(2) :263-272.
  • 7Zhou X, Xi L, Lee J. Reliability-centered predictive mainte- nance scheduling for a continuously monitored system subject to degradation[ J]. Reliability Engineering and System Safe- ty, 2007,92(4) :530-534.
  • 8Wu S, Clements-Croome D. Preventive maintenance models with random maintenance quality [ J ]. Reliability Engineer- ing and System Safety, 2005,90( 1 ) :99-105.
  • 9Le M D, Tan C M. Optimal maintenance strategy of deterio- rating system under imperfect maintenance and inspection u- sing mixed inspection scheduling [ J ]. Reliability Engineer- ing and System Safety, 2013,113:21-29.
  • 10Nakagawa T, Mizutani S, Chen M. A summary of periodic and random inspection policies [ J ]. Reliability Engineering and System Safety, 2010,95 (8) :906-911.

共引文献97

同被引文献87

引证文献4

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部