风电场集电线路杆塔倒塌原因及对策探讨

Discussion on Causes and Countermeasures of Tower Collapse of Collector Line in Wind Farm
下载PDF
导出
摘要 在恶劣的大风和冰冻灾害等不利气象条件下,风电场集电线路荷载严重超过设计负荷,多重原因导致集电线路杆塔倒塌。论文分析了风电场集电线路杆塔倒塌的原因,并从工程设计、现场施工、现场管理控制等方面提出相应的处理和解决措施,确保后续工程的安全运行。 Under the adverse meteorological conditions such as severe wind and freezing disasters,the load of the collecting line of the wind farm seriously exceeds the design load,and multiple reasons lead to the collapse of the collecting line tower.This paper analyzes the causes of the collapse of the collecting line tower of the wind farm,and puts forward corresponding treatment and solutions from the aspects of engineering design,construction,management and control,so as to ensure the safe operation of the follow-up project.
作者 邵明德 SHAO Ming-de(PowerChina Zhongnan Engineering Corporation Limited,Changsha 410014,China)
出处 《工程建设与设计》 2022年第5期47-49,共3页 Construction & Design for Engineering
关键词 风电场 集电线路 杆塔倒塌原因分析 对策措施 wind power farm collector line reason analysis of tower collapse countermeasures
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部